{"id":14754,"date":"2026-06-09T07:15:58","date_gmt":"2026-06-09T07:15:58","guid":{"rendered":"https:\/\/atlaspress.news\/en\/2026\/06\/09\/tapi-pipeline-herat-52-percent-completion-taliban-report\/"},"modified":"2026-06-09T07:15:58","modified_gmt":"2026-06-09T07:15:58","slug":"tapi-pipeline-herat-52-percent-completion-taliban-report","status":"publish","type":"post","link":"https:\/\/atlaspress.news\/en\/2026\/06\/09\/tapi-pipeline-herat-52-percent-completion-taliban-report\/","title":{"rendered":"TAP Pipeline Project in Herat Reaches 52% Completion, Taliban Mining Authority Reports"},"content":{"rendered":"<p>The Taliban&#8217;s Mining and Petroleum Directorate has announced that construction work on the Herat phase of the Turkmenistan-Afghanistan-Pakistan-India (TAPI) gas pipeline project has reached approximately 52% completion. According to the directorate, a significant portion of the technical activities and route preparation for this phase has been completed.<\/p>\n<p>Homa Youn Afghan, spokesperson for the directorate, wrote on her X (formerly Twitter) page that so far, 80 kilometers of pipeline have been welded, and about 126 kilometers of the pipeline corridor or route has been prepared. She added that 108 kilometers of access and monitoring roads have also been constructed to facilitate the work.<\/p>\n<p>According to the information provided, an additional 72.3 kilometers of required pipes have been transported to the project area. However, no further details have been released concerning the timeline for completing the Herat phase or how the remaining costs will be financed\u2014a matter on which experts have consistently stressed the need for transparency.<\/p>\n<p>The TAPI project is one of the major regional natural gas transit initiatives, intended to transport Turkmen gas through Afghanistan to Pakistan and India. Over the years, the project has been highlighted as a significant opportunity for economic growth and job creation in Afghanistan, yet its practical progress has continually faced security, financial, and political challenges.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The Herat phase of the TAPI gas pipeline project has reached 52% completion, with key construction milestones achieved, according to the Taliban Mining Directorate.<\/p>\n","protected":false},"author":2,"featured_media":14753,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[7,17],"tags":[],"class_list":["post-14754","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-business","category-important-news"],"_links":{"self":[{"href":"https:\/\/atlaspress.news\/en\/wp-json\/wp\/v2\/posts\/14754","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/atlaspress.news\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/atlaspress.news\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/atlaspress.news\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/atlaspress.news\/en\/wp-json\/wp\/v2\/comments?post=14754"}],"version-history":[{"count":0,"href":"https:\/\/atlaspress.news\/en\/wp-json\/wp\/v2\/posts\/14754\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/atlaspress.news\/en\/wp-json\/wp\/v2\/media\/14753"}],"wp:attachment":[{"href":"https:\/\/atlaspress.news\/en\/wp-json\/wp\/v2\/media?parent=14754"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/atlaspress.news\/en\/wp-json\/wp\/v2\/categories?post=14754"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/atlaspress.news\/en\/wp-json\/wp\/v2\/tags?post=14754"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}